Incident Feed
Banibrata Bakshi
Banibrata Bakshi OPS
6 days ago Near arrival belt no.5
Acknowledged
#INC-2026-0540 Medium Cleaning Issue Overdue
Cleaning and hygiene-related issues

Dist accumulation over artificial tree

Image
Soma Paul
Soma Paul CIVIL
6 days ago Sha 3
Resolved
#INC-2026-0539 Medium General Civil Works
Problem: General Civil Works (CIVIL)

The cables need to be covered properly

Image
Image
Soma Paul
Soma Paul ELE
6 days ago Voltas panel room no 33D
Escalated
#INC-2026-0538 Medium HVAC Overdue
Report: HVAC (ELE)

The set top box repeater needs to be fixed on wall to avoid any accidents inside Voltas panel room no 33D

Image
Soma Paul
Soma Paul AS
6 days ago At SHA 4
Acknowledged
#INC-2026-0537 Medium General AS Work Overdue
Report: General AS Work (AS)

The hanging cable needs to be fixed properly

Image
Soma Paul
Soma Paul CIVIL
6 days ago At sha 4
Resolved
#INC-2026-0536 Medium General Civil Works
Report: General Civil Works (CIVIL)

The desk needs repairing

Image
Image
Soma Paul
Soma Paul ELE
6 days ago The lift lobby beside sha 4
Escalated
#INC-2026-0535 Medium HVAC Overdue
Incident: HVAC (ELE)

The broken door needs to be repaired , needs covering

Image
Soma Paul
Soma Paul AS
6 days ago In PESC area
Acknowledged
#INC-2026-0534 Medium DFMD Issues Overdue
Issue: DFMD Issues (AS)

The paper numbering needs to be replaced by proper sticker numbering for all the DFMD IN PESC area

Image
Soma Paul
Soma Paul AS
6 days ago In PESC area
Acknowledged
#INC-2026-0533 Medium General AS Work Overdue
Incident: General AS Work (AS)

In PESC area some acp sheets need to be placed properly coordination required with civil,AS ,IT , nd electrical dept as lot cables are fixed on the base of the sheet which is unable to hold the load

Image
Image
Image
+2 more
Soma Paul
Soma Paul ELE
6 days ago In PESC area
Acknowledged
#INC-2026-0532 Medium Electrical Issue Overdue
Electrical problems and outages

In PESC area some acp sheets need to be placed properly coordination required with Civil,AS ,IT , nd electrical dept as lot cables are fixed on the base of the sheet which is unable to hold the load

Image
Image
Image
+2 more
Soma Paul
Soma Paul IT
6 days ago In PESC area
Escalated
#INC-2026-0531 Medium IT/Network Issue Overdue
IT infrastructure and network problems

In PESC area some acp sheets need to be placed properly coordination required with Civil,AS ,IT , nd electrical dept as lot cables are fixed on the base of the sheet which is unable to hold the load

Image
Image
Image
+2 more
© 2026 SAMANVAY. All rights reserved. v1.0.0 | Incident Reporting & Management